Case Study HTD - Automotive

HTD enters the automotive sector
How one of the largest car manufacturers has revolutionized its control process
Before
The traditional method was used to test the gears of the gearbox
Time required: 45 minutes per piece
Image
Goal
To be able to control 100% of the production, which is not feasible with existing instruments for reasons of time and destructiveness of the test
Image
Image
Image
Image
Image
Solution

  • The test of some samples found a perfect correspondence with the values detected with the traditional method
  • Special supports have been designed and manufactured to ensure adequate support for the parts
  • In addition to the supports, a special anvil has been created with the aim of positioning the pieces in the exact desired point

Image
Image
Image
The adoption of the solution we proposed made it possible to achieve the initial objective of total production control as well as considerable advantages:
  • Elimination of waste
  • Savings on consumables related to metallographic preparation
  • Speeding of the test
  • Elimination of the risk of incorrect workpiece positioning
Achieved benefits:
  • Productivity improvement
  • Testing costs reduction
  • Testing extension
  • Human resources reused on more profitable tasks
Via Monte Tagliaferro 6 - 21056 Induno Olona (VA) - Italy T. +39 0332 200 216 - F. +39 0332 202 623 corporate@cisam-ernst.com
2019 © CISAM-ERNST s.r.l. - P.iva 00217510122  - Privacy Policy - Cookie Policy - Area Riservata

Cisam